Joined
·
234 Posts
I watched the DNR crew putting in the Boat Docks at the launch ramp at Harley Ensign yesterday.
The docks were not in at Selfridge, that will probably their next project.
Crocker launch area has more mud then I've seen in passed years, two feet higher than water level and it go from shore out to about 30' from shore line (so it will be a big clean up job this year)

The docks were not in at Selfridge, that will probably their next project.

Crocker launch area has more mud then I've seen in passed years, two feet higher than water level and it go from shore out to about 30' from shore line (so it will be a big clean up job this year)
